Five Mile Creek Sewer Extension
Boise, ID

Civil engineering services were provided services to the City of Boise for design and construction of over 5,400 lineal feet of 21-inch and 8-inch sanitary sewer.  The project involved complete civil engineering design needed to complete the sewer interceptor lines that extended service along Maple Grove Road  (1,000 feet), then paralleling the Five Mile Creek Drainage to Saturn  Way, then along Saturn Way to Victory Road, then terminating with a 500-foot extension to the west of Saturn Way on Victory Road.  Our staff was responsible for complete project design and development for the project.  Key project elements included, alignment development, property owner contacts, easement agreement and legal description preparation, easement acquisition from eight different property owners, appraisals, easement negotiations and coordination, wetland delineation, USACOE 404 permitting for Five Mile and Three Mile Creek Crossings,  irrigation restoration, sewer trench depths in excess of 20-feet, utility coordination, temporary creek re-alignment, a bridge crossing on Victory Road, roadway restoration, traffic control and as-built drawing preparation.

Five Mile Creek Sewer Extension
Five Mile Creek Sewer Extension
200 OK

OK

The server encountered an internal error or misconfiguration and was unable to complete your request.

Please contact the server administrator, [no address given] and inform them of the time the error occurred, and anything you might have done that may have caused the error.

More information about this error may be available in the server error log.