Idaho Power Company consulted with Erickson Civil to develop a method to model, render and produce scaled, accurate graphics to depict a proposed 138 kV transmission line from the Hailey Substation to the Wood River Substation through the Wood River Valley. Various modeling software packages and GPS systems were utilized in collaboration with our in house professional graphic design and photography staff to collect imagery and develop the models. The models illustrate the "real world" view of the proposed transmission and distribution lines from the various vantage points along the project corridor. The images were organized by our in-house graphic design staff as presentation materials in both hard and electronic formats for use during public open house presentations and Public Utility Commission review.




