White Drain Sewer Trunk Extension
Boise, ID

The White Drain Sewer Trunk included approximately 17,300 LF of sanitary sewer ranging in diameter from 8-inch to 24-inch.  Civil engineering services included project management for the design, easement acquisition, construction drawing preparation, bid document preparation and construction administration.  Easements were acquired from 16 different property owners, which were negotiated by our staff and all were donated to the City of Meridian (no cost-mutual benefits).  Several crossings were installed along the sewer alignment and license agreements were coordinated with the Settler’s Irrigation District.  The design portion of the project required ongoing coordination since adjacent development was attempting to occur in concert with the sewer design and construction.  The project was successfully completed within allotted schedule and budget.

White Drain Sewer Trunk Extension
200 OK

OK

The server encountered an internal error or misconfiguration and was unable to complete your request.

Please contact the server administrator, [no address given] and inform them of the time the error occurred, and anything you might have done that may have caused the error.

More information about this error may be available in the server error log.